Wakefield Run
Stream Restoration Project

May 6, 2019

Follow the progress as Wakefield Run gets a healthy habitat makeover.
Our photo documentation proceeds at a more leisurely and seasonal pace now as the patient engineer Nature takes over from the boys in bulldozers. Check back from time to time as we record the changes that take place along Wakefield Run following the restoration project.

Several of our photo checkpoints have become rather difficult to locate as they have become obscured by growth of vegetation along the banks.

Photo Checkpoint 1 - Mouth of Wakefield Run
Wakefield Run, May 6, 2019
Photo Checkpoint 2 - Beneath Cross County Trail bridge
Wakefield Run, May 6, 2019
Photo Checkpoint 3 - Rock vane
Wakefield Run, May 6, 2019
Photo Checkpoint 4 - Next rock vane (north wall)
Wakefield Run, May 6, 2019
Photo Checkpoint 5 - Boulder on south bank
Wakefield Run, May 6, 2019
Photo Checkpoint 6 - Next boulder on south bank
Wakefield Run, May 6, 2019
Photo Checkpoint 7 - Second root wad
Wakefield Run, May 6, 2019
Photo Checkpoint 8 - Second root wad
Wakefield Run, May 6, 2019
Photo Checkpoint 9 - Second root wad
Wakefield Run, May 6, 2019
Photo Checkpoint 10 - Rock channel below plunge pool
Wakefield Run, May 6, 2019
Photo Checkpoint 11 - Atop I-495 culvert, facing downstream
Wakefield Run, May 6, 2019